Liberty Village could see a dramatic change in scaling if a 55-story mixed tower is proposed in the Liberty Street 147. Designed by Sweeny & Co Architects Inc. for deliberate capital with 179.62 m it would be the highest in the area, 11 floors and 30 meters higher than those so far highest, while the highest is highest and 71.7 meters high. On its basis, the proposal would contain cultural elements from several buildings.
View to the southwest until 147 Liberty Street, designed by Sweeny & Co Architects for deliberate capital
Once an industrial area of ​​the factories and warehouses, Liberty Village has turned over the past decades, especially with the industrial buildings renovated as offices and more recently into a mixed quarter. The 147 Liberty Street Assembly currently houses one to two-story trading structures, including brick buildings of the early 20th century, in which the SF Bowser and company factory and the Arlington Company of Canada factory and parking are once housed.
View south to the existing Heritage buildings designed by Sweeny & Co Architects for deliberate capital
The location over 2673 m² in 147 to 151 Liberty Street and 54 to 68 Fraser Avenue brought larger buildings further east.
An aerial recording of the site and the surrounding area, picture of the submission to the city of Toronto
On behalf of the developer, Bousfields has submitted both the official plan and the applications for statutes to the city of Toronto, since the location is currently being dismantled as areas of employment. Since the assembly is located in the large transit station of the exhibition station on the Go Lakeshore West Line and in the future Ontario Line 3, which is now under construction, this place US location in general, where the province wants to see more density.
An total gross area (GFA) of 44,380 m² contains 43,240 m² for living use and 1,140 m² for office space, which leads to a floor surface index (FSI) of 16.6. On the street level, the offices along the Liberty Street would extend over 574 m², with another 567 m² office space on the second floor. A Giaimo inheritance-IMPACT evaluation notes that 147 Liberty Street would keep in situ, while the east facade of 58-66 Fraser Avenue is preserved. The western part of this structure and 54 Fraser Avenue would be torn down.
Look at the northwest of the podium, which was designed by Sweeny & Co Architects for deliberate capital
The proposal comprises 1,269 m² interiors and 930 m² exterior equipment, which are located on level 2, 3 and 30. The proposal comprises 732 residential units operated by six elevators or one Pro 122 units and require high -speed engines for an appropriate service. The design suggests a parking level with 30 vehicles, 27 of which would be for visitors and 3 for the residents, which would prioritize transit use. For cyclists, provisions include 662 long-term and 74 short-term rooms. The bicycle infrastructure includes bicycle tracks on the street and multi -purpose routes associated with the Martin Goodman Trail and the Fort York region.
Earth -storey plan, designed by Sweeny & Co architects for intentional capital
The nearby TTC surface routes include the 504 King StreetCar and the bus routes Duffer and Ossington. The extended exhibition Go Station is currently under construction in Ontario Line 3 and acts as a western term, while a new go station, the planned but not financed King Liberty GO, could be a little further northeast. The exhibition station is about six minutes on foot from the area.
An aerial absorption of the surrounding current and future transit, picture of the submission to the city of Toronto
The environment sees considerable development activities. In the west, 8 temples on 15 floors and 10-20 Tyndall Avenue are planned on 25 floors. In the north there is the XO2 owner apartments in King and Dufferin on 19 floors, cooler is proposed as three towers in Queen and Dufferin of 9 to 29 floors. In the east, 58 Atlantic is planned on 10 floors, while in northeast 1071 King West is under construction in 17 floors. In the southeast, the castle is planned as a 10- and 11-storey office and retail complex, while the renovation between 19 and 20 floors, which is connected with the exhibition in connection with the renovation of the exhibition. Larger developments arise east; Liberty Yard is proposed with three towers of 32 to 36 floors, and 80 Lynn Williams are planned on 44 floors.
Urbantoronto will continue to pursue progress in this development. In the meantime, however, you can find out more about this from our database file linked below. If you want, you can join the conversation in the associated project forum thread or leave a comment in the room provided on this page.
* * *
Urbantoronto has a research service, UtPro, which delivers comprehensive data on development projects in the Greater Golden Horseshoe – from the proposal to completion. We also offer immediate reports, downloadable snapshots based on the location, and a daily subscription newsletter, New Development Insider, which pursues projects from the first application.



